by maximus | Jun 27, 2019 | Market - Soil Stabilization, Past Projects
R&K Excavation was hired as a subcontractor to perform the soil stabilization scope of work on the runway renovations at Paul Vance Fredericktown Regional Airport in Fredericktown, MO. R&K incorporated a CODE L product in the soil with their Wirtgen...
by maximus | Jun 27, 2019 | Market - Utilities and Infrastructure, Past Projects
R&K Excavation was the low, qualified bidder on a water/sewer project in Pevely, MO. We installed 10” watermain and 8” sewer main to supply a new commercial development. Scope of work included clearing and excavating a trench that ran parallel to high voltage...
by maximus | Jun 27, 2019 | Past Projects
In summer of 2017 our athletic construction team was in Fayetteville, Arkansas performing the base work for Mitchell Field Intramural Facility at the University of Arkansas. The facility consisted of 304,000 SF (6.97 acres) of artificial turf fields. R&K scope of...
by maximus | Jun 27, 2019 | Market - Commercial, Past Projects
R&K Excavation completed the demolition and removal of structures at the site of a retired golf course. Clearing, grubbing and grinding of trees and underbrush took place. This project required rock drilling and blasting of 216,000+ cubic yards of material, mass...
by maximus | Jun 27, 2019 | Market - Utilities and Infrastructure, Past Projects
R&K Excavation completed rock drilling and blasting services for this project. Pre-slit drilling and blasting of 17,000+ drill feet took place, and 118,000+ cubic yards of excavation material were generated. This project was completed while the roadway remained...