R&K Excavation installed 35,000+ linear feet of storm drain, sanitary sewer and water pipe at the Imperial, Missouri, residential site. We also completed rock drilling and blasting of 178,000+ cubic yards of material. This is included in the 346,000+ cubic yards of material we excavated and placed during the summer of 2006. This project included the construction of a “boulder” wall of 500+ feet.