CURRENT PROJECTS

Forsyth, MO: Forsyth High School Softball

Forsyth, MO: Forsyth High School Softball

R&K Excavation was contracted by ATG Sports for a high school softball field in Forsyth, MO. Our scope of work includes: site demo and grading, site drainage, fabric installation, base rock installation, and finish grading.

read more
Pevely and Hillsboro, MO: Dispensary Projects

Pevely and Hillsboro, MO: Dispensary Projects

R&K Excavation was contracted by JE Foster building Company to perform earthwork & civil services for Dispensary projects located in Pevely, MO and Hillsboro, MO. The scope of work includes: site demo and grading, sanitary sewers, storm sewers, watermain and finish grading.

read more
Farmington, MO: Pine Trails

Farmington, MO: Pine Trails

R&K Excavation was contracted by Farmington Pine Street Property to perform the site work, SWPP, demolition and paving for a new residential project to service a 50 lot subdivision and villa complex.

read more
JEFFERSON COUNTY, MO: Comtrea

JEFFERSON COUNTY, MO: Comtrea

R&K was contracted by Comtrea Health Center for a new location in Jefferson County, MO. Our scope of work includes site demo, clearing & grinding of trees, site grading, storm sewers, SWPP , and finish grading.

read more

PAST PROJECTS

Williamsburg,IA: Williamsburg Track and Field Improvements

Williamsburg,IA: Williamsburg Track and Field Improvements

R&K Excavation was contracted by ATG Sports for a track and field improvement project at Williamsburg High School in Williamsburg, IA. This project includes demoing items on-site, the sub-base for a new 8 lane track/ field events & a new synthetic turf football field. 

read more
Union, MO: Union Middle School New RamTurf Field

Union, MO: Union Middle School New RamTurf Field

R&K Excavation was contracted by ATG Sports for a new project at Union Middle School in Union, MO. This project includes building the sub-base for a new 6 lane track, new pole vault runway, new long jump/triple jump runways & a new multipurpose synthetic turf field. Our scope of work includes: site demo and grading, milling existing asphalt track, soil stabilization, site drainage, fabric installation, base rock installation, laser grading and finish grading.

read more
BOSS, MO: Doe Run Company – SVG Line

BOSS, MO: Doe Run Company – SVG Line

R&K was contracted by Doe Run to tear out the existing two pump system for the SVG system and install new two pump system and piping. This system is for one operational pump and one back up pump. It will supply 1,000 GPM at the end of SVG line.

read more
STE.GENEVIEVE,MO: Lhoist

STE.GENEVIEVE,MO: Lhoist

R&K was awarded a contract with Capital Railroad to complete the earthwork and civil services for a new rail spur to service the Lhoist Ste. Genevieve plant. The project consisted of site demo & material removal, grading, storm sewer, and sub-ballast placement. This was the first rail project completed by R&K but hopefully not the last.

read more
HANNIBAL,MO: Continental Cement

HANNIBAL,MO: Continental Cement

R&K was contracted to overhaul a sand filter at the Continental Cement Hannibal location. The sand filter serves as suspended solid management for one of their outfall reservoirs. The project consisted of digging out the existing filter media, cleaning of existing drainage pipes, and replacing the old media.

read more
BOSS, MO: Doe Run Company – Galena Substation

BOSS, MO: Doe Run Company – Galena Substation

R&K was contracted by Doe Run to build a new substation at the BRRD location. Work to be completed: Install Temporary erosion controls, Site Clearing and Grubbing, Grade and Shape site and access road, Install permanent storm water controls.

read more
MEXICO, MO: Mexico High School Athletic Complex

MEXICO, MO: Mexico High School Athletic Complex

R&K Excavation was contracted by ATG Sports for 3 field athletic complex in Mexico, MO. Our scope of work for the baseball, soccer and football field includes: site demo and grading, soil stabilization, site drainage, fabric installation, base rock installation, laser grading and finish grading.

read more
IMPERIAL, MO: Dale Drive / Williams Street

IMPERIAL, MO: Dale Drive / Williams Street

R&K Excavation was contracted for a water main installation in Imperial, MO. Our scope of work consists of the construction of approximately 913 feet of 8-inch PVC water main and appurtenances along Williams Drive and Dale Drive from Short Drive to E. Romaine Creek Road.

read more
PALMYRA, MO: BASF Corporation

PALMYRA, MO: BASF Corporation

R&K was awarded a contract at the BASF Corporation Palmyra plant to install approximately 6000 ft. of 24” HDPE fusion pipe for a new process water header project.  BASF Corporation is the largest chemical producer worldwide.  The project consisted of routing the new water header below and above ground around the perimeter of the 170 plus acre site.  This header will service their plant operations for the foreseeable future.  Being the general contractor of the project, R&K was also responsible for additional phases of the project, including concrete support structures, stainless steel pipe transitions, culvert installations, and more.  R&K teamed with ISCO Industries and their certified fusion technicians to complete the pipe install.  Additionally, with the help of local general contractors, the project was completed safely and under budget. 

read more
IMPERIAL, MO: Arlington Heights

IMPERIAL, MO: Arlington Heights

After completing Phase 1 for Rolwes Company, R&K Excavation now has the privilege of preparing the Arlington Heights subdivision for Phase 2. This residential development is located in Imperial, MO. Phase 2 consist of 65,000 CY of grading. Phase 1 of the project was 176 lots and we performed the mass excavation all the site utilities. The package also included multiple bores and additional water and sewer lines that were offsite and had needed to be extended to service the new development.

read more
SPRINGFIELD, MO: Springfield Public Baseball

SPRINGFIELD, MO: Springfield Public Baseball

R&K Excavation was contracted by ATG Sports for a Public Baseball project in Springfield, MO. Our scope of work included site demo, clearing & grinding of trees, CUT/FILL 10,000CY, drainage pipe, base rock installation, and finish grading.

read more
TERRE HAUTE, IN: Menards

TERRE HAUTE, IN: Menards

R&K EXC performed the sitework package for the new construction of a Menards in Terre Haute, IN. We self-performed all clearing & grubbing, mass grading (+/- 110,000 CY), value engineered French-drain system, storm sewers, soil stabilization, parking lot base rock installation and finish grading.
General Contractor: CDI Construction

read more
MACON, MO: Macon High School

MACON, MO: Macon High School

R&K Excavation was contracted by ATG Sports for a Macon High School project in Macon, MO. Our scope of work included site demo, clearing & grinding of trees, site grading, lime stabilization of subgrade, drainage pipe, base rock installation, and finish grading. 

read more
FESTUS, MO: Birchwood

FESTUS, MO: Birchwood

Birchwood is a G’Sell Contracting residential development located in Festus, MO. This scope of work include 70 Acres, 40 of which are being developed into 178 building lots. The job site has 175,000 cubic yards of rock to blast and 300,000 cubic yards of material moved in total. Storm sewers, sanitary sewers, and water-main are to be installed by R&K Excavation.

read more
FENTON, MO: Scott Gallagher Soccer Park

FENTON, MO: Scott Gallagher Soccer Park

R&K Excavation was contracted by ATG Sports on the new turf soccer field at Scott Gallagher Soccer Park development in Fenton, MO. Our scope of work includes site grading, tree clearing and grinding, field drainage, and base rock installation.

read more
BARNHART, MO: The Estates at Moss Hollow

BARNHART, MO: The Estates at Moss Hollow

The Estates at Moss Hollow is a G’Sell Contracting residential development located in Barnhart, MO just ¼ mile south of Highway M on Moss Hollow Road. This 40 acre site has 94 homes sites. R&K Excavation moved 65,000 cubic yards of dirt, and blast and move 60,000 cubic yards of rock. Storm water sewers, sanitary sewers, and water were installed by R&K Excavation. R&K Excavation was also responsible for the installation of the bridge needed to cross Moss Hollow Creek in order to access the development.

read more
EUREKA, MO: United St. Louis Academy

EUREKA, MO: United St. Louis Academy

R&K Excavation was contracted by ATG Sports for a commercial development in Eureka, MO. ATG provided R&K the needed SF to build their client the soccer park of his dreams. From there we provided the team a site plan to build on. R&K Excavation’s scope includes design, clearing/grubbing, drilling/blasting, mass excavation, finish grading and site utilities.

read more
FESTUS, MO: Wellington Place

FESTUS, MO: Wellington Place

R&K Excavation was contracted by Tinnin Homes in Festus, MO for a residential development, Wellington Place. R&K Excavations scope of work includes clearing and grinding, drilling/blasting, mass excavation, finish grading and site utilities. This project had unique challenges when it came to the blasting due to the close proximity of existing homes. R&K and Austin Powder Company put together a safe plan and executed with no issues whatsoever.

read more
PEVELY, MO: Comtrea

PEVELY, MO: Comtrea

R&K Excavation was the low, qualified bidder on a water/sewer project in Pevely, MO. We installed 10” watermain and 8” sewer main to supply a new commercial development. Scope of work included clearing and excavating a trench that ran parallel to high voltage power lines. It was a team effort that involved a clear/safe plan, great concentration and communication and a team safety effort to perform this project and complete 3 weeks ahead of schedule.

read more
FAYETTEVILLE, ARKANSAS: University of Arkansas

FAYETTEVILLE, ARKANSAS: University of Arkansas

In summer of 2017 our athletic construction team was in Fayetteville, Arkansas performing the base work for Mitchell Field Intramural Facility at the University of Arkansas. The facility consisted of 304,000 SF (6.97 acres) of artificial turf fields. Our scope of work consisted of soil stabilization, finish grading subgrade (+/- .50”), underground infrastructure, concrete curbing and base rock installation. Our aggressive scheduling and coordination with the General Contractor allowed us to successfully finish the project ahead of schedule.

read more
DE SOTO, MO: Walmart

DE SOTO, MO: Walmart

R&K Excavation completed the demolition and removal of structures at the site of a retired golf course. Clearing, grubbing and grinding of trees and underbrush took place. This project required rock drilling and blasting of 216,000+ cubic yards of material, mass excavation and placement of 357,000+ cubic yards of material, the installation of 13,900+ linear feet of storm drain and the installation of water and sanitary sewer pipe. This project included grading and excavation of the out-lots. A turn lane was also constructed for the new intersection installed on MO Hwy. 21. The turn lane required removal of a soft shoulder and installation of the turn lane and shoulder. The intersection and highway portion of this project was completed while traffic remained open. Despite the demanding schedule, we were able to complete the project on time and without error.

read more
IMPERIAL, MO: Seckman – Road Reconstruction – Completed in 2006

IMPERIAL, MO: Seckman – Road Reconstruction – Completed in 2006

R&K Excavation completed rock drilling and blasting services for this project. This required pre-split drilling and blasting and we generated 32,000+ cubic yards of excavation material. Thanks to our pre-planning and hardworking employees, we kept the roadway open to traffic while we completed the project.

read more
IMPERIAL, MO: Castle Heights

IMPERIAL, MO: Castle Heights

R&K Excavation installed 35,000+ linear feet of storm drain, sanitary sewer and water pipe at the Imperial, Missouri, residential site. We also completed rock drilling and blasting of 178,000+ cubic yards of material. This is included in the 346,000+ cubic yards of material we excavated and placed during the summer of 2006. This project included the construction of a “boulder” wall of 500+ feet.

read more
HILLSBORO, MO: Hawks Pointe

HILLSBORO, MO: Hawks Pointe

R&K Excavation completed phase one of the Hillsboro, Missouri, residential site. Phase one included clearing, grubbing and grinding of 70 acres of trees and underbrush. Mass excavation and placement of 406,000+ cubic yards of material are finished. Rock drilling and blasting for material and utilities are complete. Phase two of Hawks Pointe has been brought to rough grade and storm drain, water and sanitary sewer pipe have been installed. On the Hawks Landing project, which adjoins Hawks Pointe, R&K Excavation has completed clearing, grubbing and grinding operations.

read more
SMITHLAND, KY: Three Rivers Quarry

SMITHLAND, KY: Three Rivers Quarry

R&K Excavation was awarded the contract for the Martin Marietta Aggregates, Three Rivers Quarry expansion project. Earthmoving on the project consisted of 670,000 bank cubic yards (bcy) of stockpiled overburden removed and placed at a new dumpsite. 1.2 million bcy of overburden rock will be drilled, blasted and hauled to construct a new road for accessing the dumpsite.

read more
HANNIBAL, MO: Lowe’s

HANNIBAL, MO: Lowe’s

R&K Excavation was awarded the contract to perform site grading and utility installation for the new Lowe’s Home Improvement store in Hannibal, Missouri, from Weis Builders. R&K Excavation will clear, grub and grind in excess of three acres. Excavation, placement and compaction of more than 147,450 cubic yards of material is needed to construct the building pad, parking lot and street access. Utility installation of over 6,320 linear feet of storm, sanitary sewer and water main pipe will be located on the project site. We will also install 4,245 linear feet of silt fence for erosion control.

read more