R&K Excavation was contracted by Tulsa District- U.S. Army Corps of Engineers to demolish the existing relief well collection system, install new perforated and solid wall pipe, and reconnect the relief wells. The Hulah Dam project involved installing a new 24” solid pipe discharge line, a 5’ X 10’ collection manhole, two weir measurement manholes, and connection into the existing collection system.