R&K was chosen to perform the site work & underground piping for the new addition to the Perryville public wastewater treatment plant. The new addition will service the community of Perryville for the next 50 plus years. R&K was subcontracted by Robinson Construction to complete the project. The scope of work included
Site Work
• Preliminary Site Grading
• Drill & Blast of approximately 40,000 yards of limestone
• Site Grading & Mass Excavation
• Onsite crushing of limestone
• Structural Subgrade Preparation
• Structural Backfill
• Final Grading
• Storm Sewer
Underground Piping
• Over 5000 ft. Ductile Iron Sewer Piping (4” to 36”)
• Ductile Iron Drainage Piping
• Site Water
• Under Slab Concrete Encasement