R&K Excavation was contracted by ATG Sports for a new project at Union Middle School in Union, MO. This project includes building the sub-base for a new 6 lane track, new pole vault runway, new long jump/triple jump runways & a new multipurpose synthetic turf field. Our scope of work includes: site demo and grading, milling existing asphalt track, soil stabilization, site drainage, fabric installation, base rock installation, laser grading and finish grading.