R&K was contracted by Mississippi Lime Company in Ste. Genevieve, MO to expand their surface waste dump operation. The project entailed mass earthwork including construction of a 20 ft. berm and a clay cap of their existing surface dump. Over 100,000 yards of dirt were hauled and placed. Additional scope of work included:
– Clearing & Grubbing
– Culvert Pipe Extension
– Seed & Straw