by mycah | Dec 18, 2019 | Market - Industrial, Past Projects
R&K was contracted to overhaul a sand filter at the Continental Cement Hannibal location. The sand filter serves as suspended solid management for one of their outfall reservoirs. The project consisted of digging out the existing filter media, cleaning of...
by mycah | Dec 18, 2019 | Market - Industrial, Past Projects
R&K was contracted by Doe Run to build a new substation at the BRRD location. Work to be completed: Install Temporary erosion controls, Site Clearing and Grubbing, Grade and Shape site and access road, Install permanent storm water...
by mycah | Nov 18, 2019 | Past Projects
R&K Excavation was contracted by ATG Sports for 3 field athletic complex in Mexico, MO. Our scope of work for the baseball, soccer and football field includes: site demo and grading, soil stabilization, site drainage, fabric installation, base rock installation,...
by mycah | Nov 18, 2019 | Uncategorized
R&K Excavation was contracted for a water main installation in Imperial, MO. Our scope of work consists of the construction of approximately 913 feet of 8-inch PVC water main and appurtenances along Williams Drive and Dale Drive from Short Drive to E. Romaine...
by mycah | Nov 7, 2019 | Market - Industrial, Past Projects
R&K was awarded a contract at the BASF Corporation Palmyra plant to install approximately 6000 ft. of 24” HDPE fusion pipe for a new process water header project. BASF Corporation is the largest chemical producer worldwide. The project consisted of routing the...