Market
COMMERCIAL

Stoney Pines
R&K was contracted by Lorenzo LLC. for a new apartment complex in Barnhart, MO. Our scope of work included site clearing & grubbing, drilling & blasting, site grading, on-site rock crushing, storm sewers, sanitary sewers, water main, and finish grading.

West Village Apartments
R&K was contracted by Lorenzo LLC. for a new apartment complex in Festus, MO. Our scope of work includes site clearing & grubbing, drilling & blasting, mass grading, on-site rock crushing, storm sewers, sanitary sewers, water main, and finish grading.

Metro Blvd Gas Station
R&K Excavation was contracted by J.E. Foster Building Co. to perform sitework for the Express Mart commercial development located in Barnhart, MO. Scope of work includes: general excavation and installation of storm sewers, sanitary sewers, and water-main.

Festus Commons
R&K was contracted as the General Contractor by Festus Commons, LLC for the new commercial development in Festus, Mo. This scope of work includes 24 acres of clearing & grubbing, drilling & blasting 130,000 cubic yards, and 210,000 cubic yards of material to be moved. Storm sewers, sanitary sewers, and water-main are to be installed by R&K. Also included in the scope of work will be on-site rock crushing, site retaining walls, curb & gutter, and asphalt paving.

Isla del Sol
This project was necessary to support R&K’s sister company, FPI, as it prepared an island in the Lake of the Ozarks for condominium construction. R&K prepared the site for construction by breaking rock and excavating for the building pads, crushing the rock to make backfill for on-site construction, and then constructing a 23’ high Redi-Rock wall around a tight radius on the island. R&K continues to support the project as each building nears completion. Utility work included installation of water and sewer lines and grading to handle stormwater runoff.

Dispensary Projects
R&K Excavation was contracted by JE Foster building Company to perform earthwork & civil services for Dispensary projects located in Pevely, MO and Hillsboro, MO. The scope of work includes: site demo and grading, sanitary sewers, storm sewers, watermain and finish grading.

Menards
R&K EXC performed the sitework package for the new construction of a Menards in Terre Haute, IN. We self-performed all clearing & grubbing, mass grading (+/- 110,000 CY), value engineered French-drain system, storm sewers, soil stabilization, parking lot base rock installation and finish grading.
General Contractor: CDI Construction

Walmart
R&K Excavation completed the demolition and removal of structures at the site of a retired golf course. Clearing, grubbing and grinding of trees and underbrush took place. This project required rock drilling and blasting of 216,000+ cubic yards of material, mass excavation and placement of 357,000+ cubic yards of material, the installation of 13,900+ linear feet of storm drain and the installation of water and sanitary sewer pipe. This project included grading and excavation of the out-lots. A turn lane was also constructed for the new intersection installed on MO Hwy. 21. The turn lane required removal of a soft shoulder and installation of the turn lane and shoulder. The intersection and highway portion of this project was completed while traffic remained open. Despite the demanding schedule, we were able to complete the project on time and without error.

Lowe’s
R&K Excavation was awarded the contract to perform site grading and utility installation for the new Lowe’s Home Improvement store in Hannibal, Missouri, from Weis Builders. R&K Excavation will clear, grub and grind in excess of three acres. Excavation, placement and compaction of more than 147,450 cubic yards of material is needed to construct the building pad, parking lot and street access. Utility installation of over 6,320 linear feet of storm, sanitary sewer and water main pipe will be located on the project site. We will also install 4,245 linear feet of silt fence for erosion control.

Selma Village Business Park
Selma Village Business Park was built at the southeast corner of I-55 and Hwy. 61 in Missouri. R&K Excavation completed 17.5 acres of clearing, grubbing and grinding. This project will also include over 341,000 cubic yards of rock blasting and excavation of over 425,000 cubic yards of material.